Line Painting Picture

Please be advised, a contractor for the Department of Public Works will be performing roadway line painting on Monday, August 5, 2024 and Tuesday, August 6, 2024 between the hours of 8AM and 4PM.  Painting will take place on sections of the following roadways:  Mt. Eyre, Woodside, Twining, Quarry, Township Line, Edgewood, Oxford Valley, Derbyshire, Makefield, Sutphin, and Sandy Run Roads.  Please use caution in these areas when road crews are present and obey all warning and advisory signage and directions. 

Here are a few tips:

  • Stay back 500 feet from the line-painting equipment
  • Don't drive on the wet paint lines
  • Don't pass the trucks in the paint train, and please
  • BE PATIENT! The paint truck will pull over periodically to let traffic pass.

Recent Articles